Title: Propuesta de mantenimiento productivo total (TPM) en el proceso de molienda primaria de la planta de argos S.A Valle del Cauca
Authors: Masso Alzate, John Alexander
Benavidez Taquez, Mario Fernando
Keywords: Calidad
Mantenimiento
Productividad
Efectividad
Issue Date: 2019
Publisher: Universidad Santiago de Cali
Citation: Benavidez Taquez, M. F. (2019). Propuesta de mantenimiento productivo total (TPM) en el proceso de molienda primaria de la planta de Argos S.A Valle del Cauca. Universidad Santiago de Cali.
Abstract: La propuesta de implementación del sistema de Mantenimiento Productivo Total -TPM- pretende mejorar los índices de disponibilidad de las moliendas primarias, reduciendo los tiempos de paradas e incrementado la productividad laboral, a partir de alertas tempranas que indiquen por medio de alarmas de predicciones, fallas en las moliendas primarias que se podrán detectar a tiempo. Esto mejoraría la productividad total, una condición necesaria para la competitividad. Además se busca que esta propuesta sirva de modelo para futuros trabajos y capacitaciones en otras áreas de la empresa con el fin de que los colaboradores de la planta de cementos Argos logren identificar posibles fallas, evitando los sobrecostos de mantenimiento.
Description: This document presents the proposal for a change in the maintenance process that is currently being used in the Calera cementos Argos S.A. plant located in the village of Mulaló, Yumbo (Valle del Cauca). Reports have been received, informing about recurrent stops that were presented at the plant during the years 2017 and 2018. The start-up of the current maintenance, the difficulties presented during this process and the different dependent and independent variables that influence the operation of the primary mills to stop were analyzed. The proposal for implementation of the Total Productive Maintenance System -TPM- aims to improve the availability rates of primary mills, reducing machine down-town and increasing labor productivity, (by using prediction and failure alarms that help detect these early) based on early warnings that indicate by means of prediction and failure alarms. in the primary grindings that can be detected in time. This would improve total productivity, a necessary condition for competitiveness. It is also intended that this proposal serve as a model for future work and training in other areas of the company so that the employees of the Argos cement plant can identify possible failures, avoiding additional costs regarding maintenance.
URI: https://repository.usc.edu.co/handle/20.500.12421/110
Appears in Collections:Ingeniería Industrial